carlos907030 carlos907030
  • 01-08-2017
  • Mathematics
contestada

if structural steel installed in 2.75 floors of a building 2 3/8 day , how long will it take to install steel in 11 floors

Respuesta :

gentlebiker
gentlebiker gentlebiker
  • 01-08-2017
I will take 9.5 days, to install steel in 11 floors.
Answer Link

Otras preguntas

What is the slope of the line that contains the points (-2, 2) and (3, 4)?
On planet x, the absolute pressure at a depth of 2.00 m below the surface of a liquid nitrogen lake is 5.00 × 105 n/m2. at a depth 5.00 m below the surface, the
What was the main purpose of the antisaloon league In the early 1900s?
What is an advantage of terrorism
how many atoms are in 5 grams of H2O?
He is a very valiant trencherman; he hath an excellent stomach." Valiant comes from the Latin valere. Based on the context of the excerpt, valere most likely
I need help on this question
1) 8^ (2/x)=4 solve for x 2)25^ (1/x+3) = 1/5 solve for x
Please help solve ASAP
How do I find the slope and y intercept of this table