In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

If you move a substance from one container to another and its volume changes, the substance is a, A. solid B. liquid C. gas D. both solid and liquid 10. for the
What is 8/33 as a decimal?
How do work this problem 1/10 of 90 is
a shopper bought a 15 pound bag of oranges for $23.25 what was the unit price
Why were Japanese Americans in Hawaii not forced to go to internment camps?
What does y=x+5 mean to do in a graph ?
For how many things can use the same resource at one time
If the process illustrated in the diagram is interrupted by a chemical at point X, there would be an immediate effect on the release of (1) chlorophyll (2
For communication to take place, there has to be: A. transmission of the message. B. medium. C. sharing of meaning. D. absence of noise.
The _____ language was spoken in Egypt. Latin Egyptian Coptic Meroitic