ginapogones6676 ginapogones6676
  • 02-07-2021
  • Business
contestada

A costing system that uses actual costs for direct materials and labor and predetermined overhead rates to apply overhead is called a(n)

Respuesta :

topeadeniran2 topeadeniran2
  • 07-07-2021

Answer: normal costing system

Explanation:

A costing system which uses the actual costs for direct materials and the labor and predetermined overhead rates to apply overhead is referred to as the normal costing system.

Normal costing system is the cost allocation method whereby cost is assigned to products which are based on the labor, materials, and the overhead which are used in their production.

Answer Link

Otras preguntas

From the choices in parentheses, select the correct word for the following sentence. If you (lose, loose) the directions, we will never get there. lose loose
CondensationRadiationConvectionConduction transfers heat within the atmosphere and ocean.
The Red Sea is a body of water formed where the African and Arabian plates are separating from one another. This sea is an example of a landform created by ____
5. Why did the United States get pulled into World War I?
is cobalt chloride solution a conductor or an insulator
Ruth sees 11 flags in the park. Juno sees 4 more flags than Ruth. Sandra sees 9 more flags than Juno. How many flags does Sandra see.
Doing too much active aerobics can often result in _____ . Choose one answer. a. overuse injuries b. muscle strains c. muscle sprains d. atherosclerosis
5k=-84.05 can you help me find k?
What is ''shatter'' drug?
Animals without backbones are called ________________. a. arthropods c. invertebrates b. chordates d. vertebrates