karlrey2763 karlrey2763
  • 04-05-2021
  • Physics
contestada

Calculate the work done if a boy lifts a bag of cement 500N to the floor of a lorry 2.5m above the ground

Respuesta :

hamzaahmeds
hamzaahmeds hamzaahmeds
  • 05-05-2021

Answer:

W = 1250 J = 1.25 KJ

Explanation:

The work done by the boy is due to the change in the position of the cement vertically. Hence, the work done in this case will be equal to the potential energy of the cement:

[tex]W = P.E\\W = mgh[/tex]

where,

W = Work done = ?

mg = W = weight of cement = 500 N

h = height covered = 2.5 m

Therefore,

[tex]W = (500\ N)(2.5\ m)[/tex]

W = 1250 J = 1.25 KJ

Answer Link

Otras preguntas

sophie wrote odd numbers on her paper. what is a number sophie did not write?​
MOBIL Gas Station sells different kinds of gasoline: regular, plus, premium. Mr.Adams spent $36.25 on 12.5 gallons of regular gasoline at MOBIL Gas Station. Det
If a dress were 20% off of the marked price of $32.00, how much would it cost?
PLS HELP ASAP I WILL GIVE BRAINLIST
1 A plane moving at 30m/s drops a load 200m down to the ground. How long did it take to hit the ground.
y=x+5 y=3x solving systems by substitution​
Explain how you could convert 152 cups into gallons.
What did Southern states feel they had the right to do?
what are the vertices of triangle ABC, A(-2, 1), B(-3, -7) and C(4, -1) after translating ysing the rule (x, y)á(x+2,y-3).
In which of the following processes is it necessary to break covalent bonds as opposed to simply overcoming intermolecular forces? A. Melting mothballs B. Diss