jebrinlayan9000 jebrinlayan9000
  • 02-05-2021
  • Mathematics
contestada

Mr. Kumar is getting his house renovated. 1/5 th of the work has been completed in 2 months. How much time will it take for the entire work to be completed?

Respuesta :

liam2747
liam2747 liam2747
  • 02-05-2021

Answer:

10 months

Step-by-step explanation:

If it takes 2 months to do 1/5th, it will take 4 months to do 2/5, 6 months to do 3/5, 8 months to do 4/5, and 10 months to do 5/5 or in other words the whole thing.

Answer Link

Otras preguntas

Organisms must maintain homeostasis because cells function best when internal conditions A) change at regular intervals B) remain within a limited range C) refl
How would 0.333333 be classified?
The heart is a complex muscle. True False
The function f(x)=5000(0.98)^0.3x represents the number of white-blood cells, per cubic millimeter, in a patient x days after beginning treatment for a virus.
what is the best computer for college?
Je ne parle pas espagnol
insects breathe by using a system called tracheae. where are these tubes located on an insect
In which month are presidential elecctions held in the u.s.?
Which graph best represents a line parallel to the line with the equation y= -1/3x+4
IS ANYBODY GOOD AT MATH????