Ahmatsuper Ahmatsuper
  • 01-02-2021
  • Mathematics
contestada

A construction company can remove 25,200 pounds of dirt from a construction site in 8 hours.

Respuesta :

1726890 1726890
  • 02-02-2021

Answer:

yes they can how efficient

Step-by-step explanation:

Answer Link

Otras preguntas

where do the bad witches live in the wonderful wizard of oz
Below are works-cited entries for an Internet source published on November 7, 2010. Select the one that is completely correct. Entry A: Timothy, Eli. "The Elect
In a game of football outdoors on a cold day, a player will begin to feel exhausted after using approximately 8.0 × 105 J of internal energy. (a) One player, dr
Each pair of clay balls represents two planetesimals. If each planetesimal is composed of the same material and is separated by the same distance, which pair e
The first and easiest skill set that a human resource manager should develop is ______ skill set. a. business b. conceptual and design c. technical d. interpers
How did Muhammad change the Kaaba? A. He had it torn down to the ground. B. He added statues of traditional gods. C. He turned it into an Islamic holy
________ is the aggregation of data from simple roll-ups to complex groupings of interrelated information.
What is the solution for 7.8x-16.3=22.7???
kala runs 10 miles in 85 minutes. At the same rate, how many minutes would she take to run 8 miles
George and Carmen went on a bicycle trip. they took a bus to their starting point, and then biked the rest. They traveled 3oo kilometers in total, and they bike