xn9p7fwm4g xn9p7fwm4g
  • 01-02-2021
  • Business
contestada

a marketing plan and operating budget are two components of
a.a long range planning
b. a business plan
c. short range planning
d. a staff planning

Respuesta :

ethanm2324 ethanm2324
  • 01-02-2021
pretty sure the answer is a or b
Answer Link

Otras preguntas

The tharsis bulge on mars is most likely the result of
the length of a rectangle is 3 cm less than 4 times the width. the perimeter is 114. find the width.
Which command best completes this conversation between two friends? Ray: Recibí un correo electrónico anónimo. Pedro: Puede ser peligroso. ¡No lo_______! abras
Write two ratios that are equivalent to 5:10
The present tense of the verb estar for you, he/she requires _____.
The smallest spider , is 0.43 milimeters long , a scale of this spider is 8 centimeters long , what’s the scale of the model?
the value of the 7 in 507,264 is 10 times the value of the 7 in which number?
Kim wants to grow some more plants in her garden. she has to plan carefully because she has an allergy to plant pollen. which plant should she not plant in her
what are two fractions whose product is -3/5?
yvonne made 2 3/4 quarts of punch. Write 2 3/4 as a decimal