how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

Most evolutionists believe that there was no six-day Creation
Which of the following goods can be considered substitutes? Options Pen and Paper. Car and Petrol. Bread and Butter. Tea and Coffee.
The Ross Perot third party that ran against the Democrats and Republicans in 1996 was called the:
The jars of paint in the art room have different amounts of paint. The green paint jar is 4/8 full. The purple paint jar is 4/6 full. Which paint jar is less
If you grow 523 eggplants and sell 378, how many do you have left? A. 145 B. 197 C. 901 D. 154
A _____ change occurs when a substance changes phase
_____ is the positive difference between revenue and costs? 1. Elasticity 2. Volume 3. Net worth 4. Profitability
What conditions cause cells to break down fat molecules?
Poor circulation can cause cold feet. True or False
Muhammad II is credited with finally defeating the great Byzantine capital of Constantine Istanbul Rome Constantinople