Monkeyfeet Monkeyfeet
  • 03-10-2020
  • Mathematics
contestada

A construction company needs to remove 24 tons of dirt from a construction site. They can remove 3/4 tons of dirt each hour. How long will take to remove the dirt? Write your answer in hours.

Respuesta :

zaynah29cfc
zaynah29cfc zaynah29cfc
  • 03-10-2020

Answer: 32 hours?

Step-by-step explanation:

24 / (3/4) = 32

Answer Link

Otras preguntas

!!!!!!!!!! 50 POINTS !!!!!!!!!!!! PROBLEM IS ATTACHED.
In the 1920s the united states instituted a national origins system of immigration that was designed to
Uprisings in Paris that protested government attempts to silence critics in 1848
Does taco plus taco equal taco or burrito
Which description fits the mood expressed in this excerpt best?
Some fungi grow in association with plant roots. The fungi absorb water and minerals from the soil and share them with the plant. The plant provides the fungi w
Which of the following describes Johnson's Vietnam War strategy? A. Bringing American soldiers home as soon as possible B. Limited American support with large e
If you cut a flatworm in half, both halves can grow into a new individual by _____. budding fission fragmentation
Your flight covered about 3610 miles in 33.5 hours. Find the unit rate in miles per hour.
5x=15 what is substituted for x?