lillymcginn lillymcginn
  • 02-11-2019
  • Mathematics
contestada

A lift that weighs 300N moves a man with a weight of 950N upwards by 12m. How much work is done to move the lift this height?

Respuesta :

skyluke89
skyluke89 skyluke89
  • 07-11-2019

Answer:

15,000 J

Step-by-step explanation:

Since the lift also carries the man, the total weight of the man+lift system is

[tex]F=300 N + 950 N = 1250 N[/tex]

The work done in moving the lift upward is

[tex]W=Fd[/tex]

where

F is the weight of the lift+man combined system

d is the displacement

In this problem,

F = 1250 N

d = 12 m

Substituting,

[tex]W=(1250)(12)=15,000 J[/tex]

Answer Link

Otras preguntas

PLZ HURRY I DONT HAVE A LOT OF TIME OFFERING 50 POINTS The social reform effort that encouraged people to use self-discipline to stop drinking hard liquor was
a gift box is in the shape of a rectangular prism the box has a length of 24 cm of width of 10 cm and a height of 13 cm what is the volume of the box​
What is in important context clue and determining an appropriate definition for particular word
help plz!!!!! i'm stuckkkkkkkk
A printer prints 34 pages in 4 minutes
Need answer as soon as possible.​
Which sentence correctly describes an aspect of oil painting? A.) Artists have to work fast because oil paint dries quickly B.) Artists mix only small amounts o
Which president was in the habit of answering the phone personally in the White House
Dead Poets Society 1. Why does Nolan meet with Mr. Keating?
Feminists argue that gender matters because a. it is the basis of sex role theory. b. it structures social relations between people. c. it emphasizes natural d