_________ is the biggest problem you can face if you don’t identify the scope of your risk management project. Scope creep Noncompliance System failure Nonrepudiation

Respuesta :

Numenius
Numenius Numenius
  • 12-09-2019

Answer: Scope creep

Explanation:

 Scope creep in the project management basically refers to the uncontrolled development or growth in the project creep. It basically occur when the project scope are not appropriately defined.

It usually involve lack of change in the control system and increase the complexity of the project. It is also has poor requirement analysis.

So, that is why it is the biggest problem we usually face in the project management.

Answer Link

Otras preguntas

p^2 _ p^2 = 7 and p _ q = 2 find the value of p+q
Calculate the speed of a spider that walked 36 cm in 4 seconds.
I need answers. Thanks in advance
Write a complex sentence about a girl doing her homework PLEASEEE HELP
You collect $234 selling small and large smoothies. You sell a total of 46 smoothies. A small size is $4 and a large size is $6.50. How many of each size did yo
Find the values of 121/101​
What is the value of the 2 in 304.72 in fraction form?
How did Lincoln's 10% act affect the growth of the nation during the Reconstruction period?
A girl with a mass of 27 kg is playing on a swing. There are three main forces acting on her at any time: gravity, force due to centripetal acceleration, and th
the use of baking soda ​