When direct materials are used in production, costs are assigned by debiting Work-In-Process Inventory and crediting __________.

Respuesta :

sebastian2019 sebastian2019
  • 02-09-2019

Answer:

finished goods

Explanation:

I would assume finished goods. At a multiple process step company, you would again credit WIP materials

Answer Link

Otras preguntas

Round 845,001 to the nearest thousand
if p=8 evaluate 42÷p×3
Sasha has 4 quarters in her pocket. She has 6 times as many quarters in her piggy bank. How many quarters does she have in her piggy bank ?
10.75 convert into fraction
Something divided by something equals 132
a main reason that the age of revolutions initially failed to achieve widespread change in some nations of Europe was because?
A section of a boardwalk is made using 15boards. Each board is 9/1/4 inches wide. The total width of the section is 144 inches. The spacing between each board i
four examples of how to test a hypothesis
What is 0.675 in its simplest form?
with regard to age and social class who were the first settlers